Vogels RISE WBS65
Whiteboard-Set 65" für Rise 4000 Serie

Vogels RISE WBS65
Whiteboard-Set 65" für Rise 4000 Serie

EIA
645.00

Please log in to be able to use the shopping cart and then complete orders.

Log in
Verfügbar voraussichtlich 18 Tage ab Bestelldatum
Whiteboard set for 65” displays - Rise 4000 Serie
Item no 541050
EAN code 8712285410505
Garantie 5 Jahre Garantie

Description

The RISE WBS65 whiteboard set is a universal system that is suitable for all types of 65” (interactive) displays. With this accessory, you can attach a whiteboard to the left and right of your 65” display. The enameled steel boards are attached at the top and bottom to a hinge developed by Vogel's that maintains friction and writing stability even after frequent use. Should the friction become less than desired over time, the hinge can be easily readjusted. 

Highlights

  • 3-step installation in 20 minutes
  • For mounting on the RISE trolley, stand
  • For mounting on the RISE floor-wall solutions

Specifications

Gewicht netto 22.7 kg
Gewicht brutto 22.7 kg
Colour and design
Color Weiss
Produktdimensionen
Breite 3183 mm
Höhe 892 mm

Kompatibel mit

Last visited articles

Are you sure about this?