Vogels RISE WBS75
Whiteboard-Set 75" für Rise 4000 Serie

Vogels RISE WBS75
Whiteboard-Set 75" für Rise 4000 Serie

EIA
704.00

Please log in to be able to use the shopping cart and then complete orders.

Log in
Available
Whiteboard set for 75” displays - Rise 4000 Serie
Item no 541052
EAN code 8712285410529
Garantie 5 Jahre Garantie

Description

The RISE WBS75 whiteboard set is a universal system that is suitable for all types of 75” (interactive) displays. With this accessory, you can attach a whiteboard to the left and right of your 75” display. The enameled steel boards are attached at the top and bottom to a hinge developed by Vogel's that maintains friction and writing stability even after frequent use. Should the friction become less than desired over time, the hinge can be easily readjusted. 

Highlights

  • 3-step installation in 20 minutes
  • For mounting on the RISE trolley, stand
  • For mounting on the RISE floor-wall solutions

Specifications

Gewicht netto 27 kg
Gewicht brutto 27 kg
Colour and design
Color Weiss
Produktdimensionen
Breite 3644 mm
Höhe 1020 mm

Kompatibel mit

Are you sure about this?